From needs to priorities
One need can be solved in many ways, but time is short. See how product teams turn needs into feature ideas and choose what to build first.

One problem, many fixes
You keep reaching the office late. You could set an earlier alarm, take the metro or book a cab.
The problem stays the same, but the fixes differ in cost and effort. Product work has the same shape: 1 need can have many answers.
Ideas for one need
In the last lesson, Riya found that first-timers struggle to find their boarding point at night. Her team suggests features (things the app does for the user):
- A map pin for the stop
- A photo of the stop
- Landmark details by SMS
- Live bus tracking
Tracking is now just 1 option.
The need-feature map
Riya puts the whole chain in one view, so each feature links back to a real need:
Segment: First-timersNeed: Find boarding pointFeatures:- Map pin- Stop photo- Landmark SMS- Live trackingIf a feature links to no need, she asks why it’s there.

Your monthly salary
Say you earn ₹40,000 a month. Rent, travel and savings all compete for it, so you choose what comes first.
Riya’s team has a similar limit: 4 engineers and 1 month. Choosing what comes first is called “prioritisation”.

Impact vs effort
The simplest comparison asks 2 things. How much will this help? How much work will it take?
A map pin helps many people with little work. Live tracking helps too, but it needs location data from every bus, so it takes far longer.
The RICE score
For a closer comparison, PMs often use a formula called “RICE”:
- Reach: How many users a month?
- Impact: How much does it help each?
- Confidence: How sure are we?
- Effort: How many person-months of work?
Score = reach × impact × confidence ÷ effort.
Scoring Riya’s features
Let’s simplify with made-up numbers. All 4 features reach the same 8,000 first-timers a month:
Reach in thousandsPin: 8×2×0.8÷1 = 12.8SMS: 8×1×0.5÷0.5 = 8Photo: 8×1×0.8÷2 = 3.2Tracking: 8×3×0.5÷8 = 1.5The pin wins. Tracking, the original request, comes last.

Scores don’t decide
A RICE score is only as good as the guesses inside it. Change 1 number and the ranking can shift.
So Riya uses it to start a discussion. If safety matters most at night, she may back a lower-scoring idea and explain why.

Start small
Riya doesn’t need a perfect map pin. Version 1 covers only the 20 busiest stops in Pune, each with a pin and a short note.
The smallest version that meets the need and teaches us something is called a “minimum viable product” (MVP).
The one-page brief
Before work starts, Riya writes a short brief so everyone shares the same picture:
Segment: First-timersNeed: Find stop at nightFeature: Map pin, 20 stopsNot now: Live trackingSuccess: Fewer "where isthe stop?" callsThe “not now” line stops the work from quietly growing.

Now, next, later
Leaders and passengers will ask what’s coming. Riya shares a simple plan (PM jargon: “roadmap”) in 3 buckets.
Now: map pin. Next: stop photos. Later: live tracking. Without exact dates, she can change the order as she learns.
Summary
- Features: 1 need can be met in many ways, so list several.
- Mapping: Link every feature back to a segment and a need.
- Prioritising: Compare reach, impact, confidence and effort, then apply judgement.
- Starting small: Build an MVP, write a brief and share a roadmap.